Notting Hill Full Refurbishment

This project was completed around 2.5 years ago.

It has since won awards for the design and architecture and featured in various magazines.

Our engineer Patrick called this job ‘his baby’ he saw the job through from day one to final handover some 12 months later.

The last thing you want is a electrician running a job like this who does not know his stuff, the client was in very safe hands with Patrick.

As you can see from the photos a awful lot of thought has gone into the lighting design. Bright pink custom made iron artworks with LED strip lighting built into it onsite by Patrick transform the high ceiling and really give you something to look at.