Maida Vale Refurbishment

This high end property was a full renovation completed with a specialist building contractor.

The project lasted almost two years with every single decision having to get through a team of designers and architects before we were given very exact specifications and lists of requirements.

Millimetre perfect work was required.

Designer wallpaper was used in some areas that is installed behind light switches and sockets to create a ‘invisible’ accessory.

We have wired and commissioned lighting and power supplies to the roof terrace to include electric openers for the roof window you use to access the space.

The finish on this project is exceptional.

Refurbishment Maida Vale Electrics